Not Just Another Consulting Firm

We are engineers who designed bottling equipment and know how it is supposed to run.

Why Optimized Lines Exists

We started Optimized Lines because we saw the same pattern over and over again:

Plants investing millions in new equipment, while losing capacity in the system they already had.

The industry was solving the wrong problem.

So we built a company focused on something different: Recovering the capacity that already exists.

Our Mission

To help bottling plants recover lost capacity by understanding, stabilizing, and optimizing the systems they already operate.

The Industry Is Solving the Wrong Problem

Plants are continiously investing millions in new equipment
All the while they are losing capacity in the system they already have. Often, they are buying new equipment in isolation and not getting results because they aren’t addressing the people, protocols, and procedures needed to keep equipment optimized to reach their production goals.

They are guessing and hoping new equipment will fill the hole.

What Makes Us Different

diagnostic optimized

We See What Others Miss

We understand how machines are designed to work, and how they fail when systems become misaligned.

cropped-implementoptimized.png

Hands-on improvements from our first day on site

We arrive with laptops and tools and make the fixes we can as we diagnose your line—not just compile recommendations.

blueprint optimized

We Build Systems That Sustain Results

We don’t just fix issues, we build:

  • Repeatable processes
  • Clear documentation
  • Capable teams

So performance doesn’t drift back over time.

EMPOWER Capacity Recovery™

The Roadmap to Success

We guide every engagement through the EMPOWER Capacity Recovery™:

capacity guide for bottling plants

Our Values

optimized lines numbers-01

Clarity Over Assumption

We rely on real data and real observation, not reports or guesses.

Systems Thinking

We don’t fix isolated problems, we optimize how the entire line works together.

Hands-On Execution

We don’t stay behind a desk. We work inside the system to solve problems.

optimized lines numbers-04

Sustainable Results

If it doesn’t last after we leave, it doesn’t count.

Respect for the Team

Operators and maintenance teams are part of the solution, not the problem.

mine drawing optimized

Customer Success Transformation

When bottling plants work with Optimized Lines, they typically experience:

  • 10–25% Capacity Recovery
  • Reduced downtime duration
  • More stable, predictable production
  • Less operator intervention required
  • Teams that understand and control their systems

But the biggest shift is this:

Your team moves from constant firefighting to confidently meeting your production budget.

You recover the capacity you already own, with more production, higher morale, and less need for overtime.

How Optimized Lines Helps You Recover Capacity

Your packaging lines should be producing more, but the same problems keep holding your team back. You’ve tried to fix them. Production still falls short, the pressure builds, and overtime becomes a way to catch up. You need a clear answer to what’s limiting output—and help putting that answer to work.

The process starts with an EMPOWER Capacity Recovery™ Call to discuss your line and whether an on-site diagnostic is the right next step.

If we decide to move forward together, our engineers arrive with laptops and tools, ready to work alongside your team under real production conditions. As we diagnose what’s limiting output, we make the fixes we can right away—starting on our first day on site, not just compiling a list of recommendations.

What we learn becomes your recovery blueprint: a clear plan for what to address next and how to move forward with implementation.

As we work through the improvements together, your team gains the skills and confidence to keep meeting your production budget. Your people learn how to support the changes and sustain the gains, rather than staying dependent on outside help.

The goal is more production from your existing lines with less need for overtime, and a team better equipped to keep recurring problems from holding you back. Ready to Recover the Capacity You Already Own™? Schedule your EMPOWER Capacity Recovery™ Call.

Meet the Team

Derek Austin
Derek Austin

PLC Programming & Training Consultant

Pete Connor
Pete Connor

Founder & CEO

Wendy Connor
Wendy Connor

VP of Finance, HR, and Legal

Elizabeth Connor
Elizabeth Connor

Administrative Assistant

Tanner Crawford
Tanner Crawford

PLC Programming and Optimization Consultant

Rusty Ellington
Rusty Ellington

Commercial Operations Lead

Doug Greenwood
Doug Greenwood

Senior Controls Engineer & Filler Optimization Specialist

Eric Miller
Eric Miller

VP of Sales and Marketing

Jamie Miller
Jamie Miller

PLC Programming & Optimization Consultant

Mike Novak
Mike Novak

Senior Filler Mechanical Specialist

Robert Smith
Robert Smith

PLC Programming & Optimization Consultant

Ron Soult

Executive Vice President

EMPOWER Capacity Recovery™

Start the Process

If your bottling line is not producing what it should:

Let’s discuss what’s limiting your output and whether an on-site diagnostic is the right next step.